FEATURED PROJECTS

View our featured projects below, then get in touch with us

We are proud to show you our latest projects. You will find a diverse gallery of developments, remodeling, additions and new construction.

Construction of Pearl Breeze Resorts Pvt Ltd in Kayalpattinam

NCTPS – 1 – SE/M1 – Unit I,II& III – Boiler – Cleaning, shot blasting and epoxy painting of Boiler columns & structures

TTPS – Sand Blasting and Epoxy based protective coating to the steel structural members of Boiler and Mill Plant area in unit IV & V

NCTPS 1 – MII – ECHS – Shot Blasting and Epoxy Painting of Steel structures of Belt Conveyors 44,45,52,58 & 60 and Connected Junction Towers.

Hydro project – Kundha Power House II – Gedthai – painting of internal surface of the penstock pipe of Unit No.1 and 2 at Kundha Power House II at Gedthai.

NTPL-C&P Painting of Conveyor structures & Junction Towers in CHS-NTPL

Hydro project – Moyar PHs I -3X12 MW – Painting of internal and external surface of the penstock pipe of Unit No. I , II and III at Moyar Power House I.

Remedial measure to rectify the structural deficiency of Chinnakuttiyar Dam at Kodayar Upper (Phase – IV REACH – II) by racking & pointing the joints to the spillway portion from EL 1367.38m to top of spillway and the remaining portion of left flank.

NTPL - Painting of Shore Unloaders, Stacker Cum Reclaimers and onshore conveyor structures in Coal Handling System

NTPL - Anticorrosive Painting of UNIT 2 Boiler, Mill Plant, FGD and AHP structures at NTPL Tuticorin

Application of Fire Proofing Work Of Area A & Steel Structures & Corridors Works For Foxconn Elephant Project Banglore

Remedial measures to rectify the structural deficiency of Chinnakuttiyar Dam @ Kodayar Upper Camp (Phase – IV – REACH –I) by racking & pointing the joints in the spillway portion from E.L. 1351.38m to 1367.38m .

Protective / remedial measure for the inner surface of penstock pipe – I from Forebay to Papanasam Power House at Papanasam Lower Camp.

Remedial measures to rectify structural deficiency of Servalar Dam by racking pointings the joints- Ch. 150 to CH. 183 –REACH – IV

Remedial measures to rectify structural deficiency of Servalar Dam by racking pointing the joints – Ch.117 to Ch. 150 – Reach-III.

Remedial measure to rectify the structural deficiency of Chinnakuttiyar dam at Kodayar Upper Camp (III Phase ) by racking and pointing the joints.

Remedial measure to rectify the structural deficiency of Chinnakuttiyar Dam at Kodayar Upper Camp by racking and pointing the joints .

Providing Painting to the Penstock pipe line from Forebay to Papanasam Power House at Papanasam Lower Camp.

Normal repairs and maintenance by providing epoxy treatment / epoxy coating to the penstock pipe from Kodayar Upper Camp valve House – I to Power House – I and Valve House – II to Power House – II at Kodayar.

Providing Epoxy Treatment to 11 Nos of Steel Penstock Pipes in Kundah Power House 2,3,4 &5 in Kundah Area, Nilgiris

Supply & Application of Paints and other Painting related jobs in Zone-1 (Refinery-1 & 2, LEB-DHDS, OPH, DCU) and Zone-2 (Refinery-3 and Cogen / CPP) areas at CPCL-Manali

Execution of supply and application of anti-corrosive paint on Various Structure such Boiler, CHP, FGD, ID Fan, Mill plant structures at ITPCL Cuddalore thermal Power plant.

OUR PROJECTS

Guaranteed solution to your repair and maintenance needs

We build the finest infra and structures within our client’s budgets and time frame without sacrificing quality and workmanship. We keep you up to date on the latest greenest building practices and materials.